
Investment in road safety
The ADAC driver safety training centre in Heidelberg has been in operation since 1987. Parts of the site were last renovated in 1999.
In addition to the asphalt surface with the individual training modules, the previous building has now been demolished. The single-storey building, which was exclusively used for theory teaching, has been replaced by a new two-storey building that houses the administration department. The ground floor also features a 100-square-metre multifunctional room for conferences and events.
ADAC Nordbaden commissioned us to plan and furnish these interior spaces. VS furnished the following areas: workstations with storage space and office swivel chairs. The multifunctional room is furnished with mobile furniture and digital media equipment from VS Visuelle Medien.
In addition to supplying and installing the products, we also provided interior design support through our planning centre.
