Recycling of production residues from wood manufacturing

In our boiler house, we utilise biomass that is produced as a by-product of wood manufacturing and use it to generate energy. We use the heat produced for heating and as process heat in production.

In 2025, this enabled us to generate approximately 13 million kWh of energy in the form of space and process heat ourselves.

Our existing biomass combustion plant, Boiler House 1, is now getting on in years. We are therefore planning to commission a replacement plant in time for the 2026 heating season. The conversion will be preceded by an intensive planning phase of two years and a construction period of over a year.

View the picture gallery

This is what sets our new biomass combustion plant, Boiler House 2, apart:

  • Compared to Boiler House 1, the use of fossil fuels is significantly reduced and the proportion of bioenergy increased.
  • Cascade utilisation of the boiler systems ensures that heat is generated throughout the year as needed. This means that less energy is lost through unnecessary waste heat.
  • The new boiler house has a higher efficiency and heat recovery rate. We achieve this through more efficient combustion technology and the use of process-related waste heat.
  • By using state-of-the-art air pollution control technology, we ensure the safe reduction of emissions, thereby reducing environmental pollution and contributing to the improvement of air purity.

Actual and target state

Biomass is currently utilised via boiler house 1.

In future, biomass will be utilised via boiler house 2.

Construction progress (updated: 9 June 2026)

Kesselhaus 2 mit Kran, Verglasung wird gesetzt

14 July 2026

14 July 2026

14 July 2026

6 June 2026: The glazing is being installed.

6 June 2026: The glazing is being installed.

6 June 2026: The glazing is being installed.

29 April 2029: The building envelope is taking shape.

29 April 2029: The building envelope is taking shape.

29 April 2029: The building envelope is taking shape.

9 April 2026

9 April 2026

9 April 2026

24 March 2026: The steel framework for the building envelope is being erected.

24 March 2026: The steel framework for the building envelope is being erected.

24 March 2026: The steel framework for the building envelope is being erected.

12 March 2026: From today, the building envelope will be constructed using a steel frame.

12 March 2026: From today, the building envelope will be constructed using a steel frame.

12 March 2026: From today, the building envelope will be constructed using a steel frame.

26th February 2026

26th February 2026

26th February 2026

16 January 2026

16 January 2026

16 January 2026

15 December 2025

15 December 2025

15 December 2025

30 November 2025: The boilers are in place and are being enclosed.

30 November 2025: The boilers are in place and are being enclosed.

30 November 2025: The boilers are in place and are being enclosed.

24 November 2025: The boilers are installed

24 November 2025: The boilers are installed

24 November 2025: The boilers are installed

10 November 2025

10 November 2025

10 November 2025

25 September 2025

25 September 2025

25 September 2025

17 September 2025

17 September 2025

17 September 2025

5 septembre 2025

5 septembre 2025

5 septembre 2025

5 September 2025

5 September 2025

5 September 2025

Construction start early August 2025 following a two-year planning phase

Construction start early August 2025 following a two-year planning phase

Construction start early August 2025 following a two-year planning phase

Click on the white arrow on the right to browse through the pages.

The construction of the boiler house is being funded by the Federal Ministry for Economic Affairs and Energy with funds from the European Union's NextGeneration EU programme.

The views and opinions expressed are solely those of the author(s) and do not necessarily reflect the views of the European Union or the European Commission. Neither the European Union nor the European Commission can be held responsible for them.

More about sustainability at VS

#
Wind turbines on farmland in the Tauber valley
Climate and Environmental Protection at VS

We feel an obligation to our environment. That's why we make every effort to avoid any harmful impacts on people and nature that could arise from the manufacture, use or disposal of our products.

#
Award-Winning
Tested and Recommended: Not only have our products been awarded multiple certificates, so has our company.
#
Grains in front of a sunset
Our Sustainability Report

How we live and implement sustainability

Do you know someone else who may be interested?
Just share this page.